It s bendable for various pitches.
Valley flashings for metal roof.
Nrca lile recommends that roof valley flashing metal for open roof valleys should be 26 gauge 0 45mm galvanized steel or equivalent noncorrosive nonstaining metal.
This drip edge flashing provides protection from water damage along the eaves and rake of a roof.
Install synthetic roofing underlayment or felt paper according to manufacturer specifications and then install the first piece of valley flashing.
When properly installed w valley flashing will reliably channel run off water down the roof and into the gutter.
Remember to caulk the underside of the flashing with a sealant.
Lap successive sheets of metal flashing a minimum of 12 inches and seal laps.
Then install a non corrosive metal valley flashing of 24 minimum width.
With a clean valley you can lay down some peel and stick roofing membrane.
First clean the debris out of the valley including sawdust nails and whatever else is in there.
Lile points out that valleys lined with roll roofing are not as durable.
Now nail this first flashing at both its far ends.
Lay the flashing down in the roof valley and start at the lower end of the roof.
Drip edge metal valley flashing dormer chimney and kick out flashing shed water away from the connections between roofs walls chimneys and other building assemblies this collection of 18 articles animations and videos identifies the critical roof flashing areas illustrates durable roof flashing details and shows how to flash roofs right in the real world.
Roof valley flashing shall be of corrosion resistant metal of the same material as the roof covering or shall comply with the standards in table r905 10 3 1.
Gibraltar drip edge flashing can be used with asphalt shingles or metal roofing panels.
Use 1 inch galvanized roofing nails.
Step 6 install the flashing.
The extra kick at the bottom of the face directs run off away from the structure.
Install valley battens on both ends of the roof valley then attach first flashing 3 4 inches over the roof flange and another 3 4 inches over the fascia if any is present.
Be sure to check local building codes to ensure you have the proper width for your application.
Make sure that the end of the flashing panel is perfectly in line with the edge of the roof.
Install an underlayment centered in the roof valley.
Overview w valley flashing protects the critical area of your roof where two slopes come together to form a valley.
Fold the top over the roof ridge and cut the bottom along the drip edge metal.
The valley flashing shall extend not less than 8 inches 203 mm from the centerline each way and shall have a splash diverter rib not less than 3 4 inch 19 mm in height at the flow.